|


If you experience problems or have questions, email
me.
|

Deck repair to the starboard side. The core was rotten from the front
of the cabin all the way back. We thought the port side was rotten too,
but it only sounded hollow because of a hollow channel under the decks
for wiring.
| Projects Completed |
My Time
|
Cost
|
| Add Solar powered vent |
2 hrs
|
$120
|
| Clean and oil all interior teak |
20 hrs
|
$25
|
| New interior cushions |
|
$1,500
|
| Projects Left to do |
Time Estimate
|
Cost Estimate
|
| Replace rotten deck |
|
$5,000
|
| Repack stuffing box |
|
$200
|
| Replace rotten forward bulkhead |
|
$800
|
| LP Solinoid |
3 hrs
|
$50
|
| Rusted seacocks |
?
|
?
|
| Electrical system overhaul |
30 hrs
|
$1,000
|
| Rub rail repair |
8 hrs
|
$200
|
|
|